Little update.
Rear bumber and tire carrier is on, flares and corners are painted and on, engine skid frame is fab'd, and driveshafts are ordered.
I had to raise the rear 1" from the weight of the bumper and carrier.
Items left.
Bleed brakes, Program PCM, install skid plate, and install driveshafts.
If I get the shafts this week I could be driving it by Monday.
1 1/2" x 2" x 1/4" angle. It will be covered with 3/8" 6061
Rear bumber and tire carrier is on, flares and corners are painted and on, engine skid frame is fab'd, and driveshafts are ordered.
I had to raise the rear 1" from the weight of the bumper and carrier.
Items left.
Bleed brakes, Program PCM, install skid plate, and install driveshafts.
If I get the shafts this week I could be driving it by Monday.
1 1/2" x 2" x 1/4" angle. It will be covered with 3/8" 6061