Adopt-A-Trail Reports

Workday Report – Waterbar

    By Russ | Art (AW12345) and I started the 3N93 workday by digging a ditch and building a water bar to divert the water that was flowing along the east end of the trail. We continued along the trail to inspect the work that we had done during the two previous workdays.

    I am pleased to report that the water has drained from the east creek crossing, and the rocks that line the trail are once again above the water level. The western rock garden is dry. The water flow has been greatly reduced in the middle rock garden, although there is still is some water in the rock garden from seeps along the trail. The work that we did to the off camber shelf is intact.

    This is the new gate at the east end of the trail.

    One Comment