Well after a week of having the jeep entirely apart, its finally back together.
Dual Odyssey PC1200's, 400 amp battery isolator, power distribution network, all 1/0 cabling under the hood of a V8 ZJ... (not much room)
these are pictures of the 2nd battery installed with onboard air and power distribution where the stock Air box used to be..
built the bracket out of 1/8th steel and double deckered it for the mounting of the fuse box.
here you go.
Dual Odyssey PC1200's, 400 amp battery isolator, power distribution network, all 1/0 cabling under the hood of a V8 ZJ... (not much room)
these are pictures of the 2nd battery installed with onboard air and power distribution where the stock Air box used to be..
built the bracket out of 1/8th steel and double deckered it for the mounting of the fuse box.
here you go.

Comment